Project Size: 21 MW / 39 MWh – Black Start Application 

Role: Battery energy storage system (BESS) Balance of Plant (BoP) services, including engineering, BoP procurement, installation, construction, system integration, commissioning support, and tie-in at  the existing switchgear 

Technology: Prevalon  

Schedule: Construction begins in 2027, with Commercial Operation Date (COD) in 2028 

Located in Mankato, Minnesota, this stand-alone, behind-the-meter BESS project is designed to support a black start application for two gas turbines, providing energy storage capacity to support reliable facility operations. 

TruGrid is delivering a comprehensive behind the meter Balance of Plant scope, managing the project from engineering and procurement through construction, system integration, commissioning support, and electrical tie-in at the existing switchgear, which serves as the project’s Point of Interconnection (POI). This integrated approach helps streamline execution, minimize scope gaps, and support reliable operation of the BESS and existing generation assets. 

Reach Out. We’re Ready.