Project Size: 9.9MW / 20.6MWh

Role: Battery energy storage system (BESS) Balance of Plant (BoP) EPC services, including engineering, procurement, construction, system integration, and commissioning support

Technology: RelyEZ BESS / SMA PCS

Schedule: Construction begins in November 2026, with Commercial Operation Date (COD) targeted for May 2027

Located in Port Lavaca, TX, this stand-alone, front-of-the-meter BESS project interconnects at 12.47 kV and is designed to support grid reliability within the Electric Reliability Council of Texas (ERCOT) market.

By delivering a fully integrated balance-of-plant scope from engineering through system integration, TruGrid ensures streamlined execution up to the point of interconnection while minimizing risk and maintaining clear utility coordination.

Bess TruGrid Project, EPC, O&M, Integration