Project Size: 50 MW / 200 MWh  

Role: Battery energy storage system (BESS) Balance of Plant (BoP) EPC services, including engineering, procurement, installation, construction, system integration, commissioning support, and interconnection support 

Technology: Tesla  

Schedule: Construction begins in 2027, with Commercial Operation Date (COD) targeted for 2028 

Located in St. Louis, Missouri, this stand-alone, front-of-the-meter BESS project provides 50 MW / 200 MWh of storage capacity. The facility is designed to provide reliable, flexible energy capacity while supporting grid reliability and energy demand. 

TruGrid is delivering a comprehensive Balance of Plant EPC scope spanning engineering, procurement, civil, structural, and electrical construction through system integration and commissioning support. The scope extends from site preparation and equipment installation through the 34.5 kV dead-end structure outside the BESS fence, helping minimize project risk, eliminate scope gaps, and support efficient execution through COD. 