Project Size: 15.5 MWdc / 10 MWac PV + 3 MW / 15 MWh BESS 

Role: Photovoltaic (PV) Balance of Plant (BoP) and DC-coupled BESS services, including engineering, procurement of inverters and BESS equipment, installation, construction, system integration, commissioning support, and interconnection support 

Technology: Qcells North America PV Modules / Yaskawa Solectria PVS-500 Inverters  

Schedule: To be determined 

Located in Tulare, California, this behind-the-meter solar and battery energy storage project integrates a 15.5 MWdc / 10 MWac PV system with a 3 MW / 15 MWh DC-coupled BESS. The integrated system is designed to maximize on-site energy utilization while providing reliable and flexible energy capacity for the facility. 

By delivering an integrated PV Balance of Plant and DC-coupled BESS scope, TruGrid supports streamlined execution across engineering, equipment procurement, construction, system integration, commissioning, and interconnection while helping minimize project risk and ensure coordination across the solar and storage systems. 

Reach Out. We’re Ready.