Project Size: 9.9MW / 19.8MWh (2-hour duration)
Role: Balance of Plant (BoP) services, including engineering, BoP procurement, installation, construction, commissioning support, integration, and interconnection support
Technology: Hithium, EPC Power, Fractal EMS
Year Built: Construction begins in 2025; Commercial Operation Date (COD) – 2026
Located in Cameron County, TX, this stand-alone Front of the Meter Battery Energy Storage System (BESS) project supports ERCOT reliability through Ancillary Services and Energy Arbitrage. TruGrid is delivering a full-scope BoP solution, managing all phases from design and integration to grid interconnection. Our turnkey execution minimizes risk, eliminates scope gaps, and accelerates time to COD—ensuring reliable, bankable outcomes for our partners.